Tensor plc install a site wide HeatingSave system

Tensor plc design and manufacture smart card and biometric Time & Attendance and Access Control equipment. Their Hail Weston site comprises a number of buildings each with it’s own central heating system. Some of the buildings are used less frequently than others, meaning that the heating was often on when rooms were unoccupied. There is no gas in Hail Weston, so the boilers use kerosene oil, but one boiler is still solid fuel, using anthracite.

Elouise Lingerie use HeatingSave

Elouise Lingerie is shop in Buckden, Cambridgeshire selling high-class ladies lingerie, swimwear and nightwear. In 2008 their manager was considering changing their old gas boiler, which was over 10 years old, for a new combi boiler. At the same time she wanted to install a system that turned on the heating only when they needed it.

The Marine Society and Sea Cadets save thousands by installing a HeatingSave system

The Marine Society & Sea Cadets (MSSC), a charity formed in 2004 from a merger of The Marine Society and the Sea Cadet Association, exists to offer seafarers and prospective seafarers a range of services to enhance their well-being and lifestyle. The work of MSSC in support of professional seafarers has evolved over 250 years, reflecting the experiences of the UK´s maritime fortunes.

St Mary’s School save on their heating with HeatingSave

Welwyn St Mary’s Primary School takes children from ages 4 to 11. Built originally in 1940 as a secondary school, St Mary’s is a large school with spacious buildings and grounds. In addition to big classrooms the school has a gym, two libraries, a computer suite, a hall with stage and a music room. The school has a strong tradition for success in the Arts and Sport and have specialist teachers in Music, French and P.E.